Call: 289-962-4003 Email: ar.manjinderkaur@gmail.com Studio: 15845 River Dr, Georgetown, ON WhatsApp: 289-962-4003
KS Designers logo KS Designers PERMITS · DRAWINGS · INTERIORS
SHEET A-210 · RESIDENTIAL PERMIT

Basement apartment & second unit permits

Permit drawings, zoning review and city submission for new basement apartments and for legalizing units that already exist. Architectural, HVAC and fire separation drawn by one BCIN-qualified team.

BCIN-qualified drawings
City submission handled
5.0 on Google
Bright finished legal basement apartment with egress window, sofa and bedroom
TYPICAL SCOPE New units, legalizing existing units, fire separation, egress windows & HVAC
Yes.

Do you need a permit for a basement apartment?

Yes. Creating a second unit, or legalizing one that is already there, needs a building permit and has to meet zoning. The unit must meet Ontario Building Code rules for ceiling height, exits, fire separation, smoke alarms and ventilation. We check your property first so you know it qualifies.

DRAWING INDEX

The sheets in a typical permit set

Every property is different, so we confirm the exact list with your city. Most applications include:

A-001Site plan · parking, entrance location, setbacks
A-101Basement floor plan · existing and proposed layout
A-102Main floor plan · fire separation above
A-301Building sections · ceiling heights, egress windows
M-101HVAC layout · separate or shared system, heat loss
F-101Fire separation details · smoke alarms, interconnection, doors
Floor plans and building sections from a permit drawing set EXAMPLE SHEETS · ILLUSTRATIVE
WHAT WE CHECK

Key requirements we design for

Zoning & parking

Whether your property allows a second unit and how many parking spaces your city requires.

Ceiling height

Minimum clear height in rooms and under beams and ducts.

Exits & egress

A separate entrance or shared exit, plus bedroom egress windows of the right size.

Fire separation

Rated ceilings, walls and doors between the units, and interconnected smoke alarms.

HVAC & ventilation

Heating, ventilation and bathroom exhaust for the new unit.

Plumbing & electrical

Kitchen, washroom and laundry layouts and an electrical plan.

AVOID DELAYS

Why these applications get sent back

These are comments plan examiners often raise. We address each one in the drawings before we submit.

We cover this
Ceiling height under ducts or beams too low
We cover this
Bedroom window too small to count as egress
We cover this
Fire separation between units not detailed
We cover this
Not enough parking for a second unit
We cover this
HVAC not separated or not shown
THE KS PROCESS

From site visit to issued permit

A-001 · LISTEN01

Site visit

We measure the basement, check ceiling heights, windows and the existing mechanical.

A-100 · DESIGN02

Design & zoning

We confirm zoning and parking, then lay out the unit with you.

A-200 · DRAW03

Drawings & submit

Architectural, HVAC and fire separation sheets are completed and submitted.

A-300 · APPROVE04

Comments & permit

We answer plan-examiner comments until the permit is issued.

FROM OUR CLIENTS 5.0 From 7 Google reviews Read all reviews →
"Had a great experience working with them for our basement second dwelling unit project. The architectural work was done very professionally, with clear drawings, good communication, and attention to detail throughout the process."
Kulwinder K. · Basement second unit · Google review
QUESTIONS

Common questions

Can my existing basement apartment be legalized?

Often, yes. We measure what is there, show what has to change to meet code, and prepare the drawings to legalize it.

What ceiling height does a basement unit need?

The Ontario Building Code sets minimum heights for rooms and lower limits under beams and ducts. We measure yours on site and design around any low spots.

Do I need a separate entrance?

The unit needs a code-compliant way out. That can be a separate entrance or a shared one, depending on the layout and your city. We design what fits your house.

I received a city notice about my basement. Can you help?

Yes. Send us a photo of the notice. We will explain what it means and prepare the drawings needed to respond.

What should I send for a quote?

Your address, a few photos of the basement, and whether the unit is new or already built.

Planning a basement apartment?

Send us your address and a few photos of the basement. We'll tell you if it qualifies and what the city will need.

RELATED SERVICES

Often done together

Walkout & side entranceNew openings, stairs, guards and drainage.Learn more → Load-bearing wall removalBeam sizing and structural drawings.Learn more → Interior designLayouts and finishes, seen in 3D first.Learn more → Home addition permitRear, side and second-storey additions.Learn more →
WhatsApp us