What affects the cost of permit drawings in the GTA

The factors that set the price of permit drawings in the GTA: scope, existing conditions, engineering, zoning issues and city comments, and how to compare quotes.

By the KS Designers teamUpdated November 20265 min read
Permit drawings
THE SHORT ANSWER

Permit drawing fees depend mainly on the size and type of project, how much of the existing building has to be measured, whether structural or mechanical design is included, and whether zoning relief is needed. The cheapest quote often leaves out items that come back later as extra charges.

The main cost drivers

  • Project type: a deck is a small set, a legal basement or an addition is a full set, a new house is the largest
  • Existing conditions: renovations need accurate measured drawings of what is already there
  • Structure: beams, new openings, footings and second storeys need structural design
  • Mechanical: heat loss, duct layout and SB-12 energy compliance add sheets
  • Zoning: a minor variance adds an application, drawings and a hearing
  • Comments: a complex city or project can mean more revision rounds

Design fees are not the same as city fees

Your designer's fee pays for the drawings and the application work. The municipality charges its own permit fee, set by its fee bylaw and usually based on floor area or project value. Some projects also have development charges or other fees. Ask what each quote includes so you are comparing like with like.

What to check when comparing quotes

  • Is the site measurement included?
  • Are structural drawings included, or extra?
  • Are HVAC and SB-12 calculations included?
  • Does the price cover submission and responding to city comments?
  • How many revision rounds are included?
  • Is the designer BCIN-qualified for this type of building?

How to keep the cost down

Send clear photos and any old drawings or surveys you have. Decide on the layout before drawings start, since big changes after submission cost the most. And ask for a zoning check first so you do not pay for a design that cannot be approved.

Questions people ask us

Why do quotes vary so much?

Usually because they include different things. One may include structure, mechanical and comment responses; another may charge for each separately.

Is the permit fee included in your price?

No. The city charges its own fee directly. We tell you what to expect for your municipality.

Do you give fixed quotes?

Yes. Once we understand the scope, we give a written quote that lists what is included.

This guide is general information for Ontario and is not legal advice. Building Code requirements, zoning bylaws and city processes change and vary by municipality, so confirm the details for your property with your municipality or a qualified designer before you build.

SERVICES FOR THIS PROJECT

How KS can help

Basement apartment permitLegal second units, new or existing.View service → Home addition permitRear, side and second-storey additions.View service → Zoning reviewKnow what your lot allows first.View service → Permit application & city commentsWe submit and answer the city.View service →

Keep reading

All guides →
PERMIT BASICS · 7 MIN READ

How the building permit process works in Ontario

A plain-language walk through an Ontario building permit, from the first zoning check to final inspection, and how to keep it moving.

Read the guide →
PERMIT BASICS · 6 MIN READ

Built without a permit? What to do about an order to comply

What happens when work was done without a building permit in Ontario, what an order to comply means, and the practical steps to legalize the work.

Read the guide →
PERMIT BASICS · 4 MIN READ

Why a contractor's sketch won't get your permit approved

Why hand sketches and quote drawings get sent back by plan examiners, and what a proper permit drawing set contains instead.

Read the guide →
WhatsApp us