Call: 289-962-4003 Email: ar.manjinderkaur@gmail.com Studio: 15845 River Dr, Georgetown, ON WhatsApp: 289-962-4003
KS Designers logo KS Designers PERMITS · DRAWINGS · INTERIORS
KS GUIDE · COMMERCIAL

Commercial renovation permits: fit-outs, demising and change of use

What business owners should know about commercial permits in Ontario: tenant fit-outs, splitting units, medical offices, change of use and a pre-lease checklist.

By the KS Designers teamUpdated November 20268 min read
Newly fitted-out retail boutique
THE SHORT ANSWER

Most commercial fit-outs need a building permit. The key questions are whether your use is allowed by zoning, whether it is a change of use under the Building Code, and what the occupant load means for exits, washrooms and accessibility. Check these before you sign a lease.

Before you sign a lease

  • Is your business a permitted use in this zone?
  • Is it a change of use from the last tenant?
  • Are there enough washrooms for your occupant load, or will you need more?
  • Is the entrance and a washroom barrier-free, or will they need upgrades?
  • Can the HVAC handle your use, for example a kitchen or salon?
  • What does the landlord require in drawings and approvals?

Tenant fit-outs

New walls, ceilings, washrooms, lighting and changes to exits usually need a permit. The drawings show the layout, occupant load, exits, accessibility and mechanical changes.

Splitting a unit (demising)

Dividing one unit into two needs a separation wall with the right fire rating, separate exits for each side, and services that work independently.

Medical and dental offices, salons and clinics

These add sinks, special ventilation, and sometimes equipment loads or radiation shielding. Some need approvals from professional or health bodies alongside the building permit.

Change of use

When a space is used for something in a different occupancy category, such as retail to restaurant or office to clinic, the building may need upgrades to exits, fire separations, washrooms or structure, and a permit can be required even without much construction.

Questions people ask us

Does a small office renovation need a permit?

If it adds or moves walls, washrooms or exits, usually yes.

Can you check a unit before I sign?

Yes. It is the best time to find out what the space needs.

Do you design the interior as well?

Yes, interior design and permit drawings come from the same team.

This guide is general information for Ontario and is not legal advice. Building Code requirements, zoning bylaws and city processes change and vary by municipality, so confirm the details for your property with your municipality or a qualified designer before you build.

SERVICES FOR THIS PROJECT

How KS can help

Retail & office fit-outTenant improvements and layouts.View service → Salon, spa & clinicSalons, dental, pharmacies, clinics.View service → Change of use permitWhen a space gets a new use.View service → Restaurant & commercialFit-outs and change of use.View service →

Keep reading

All guides →
PERMIT BASICS · 7 MIN READ

How the building permit process works in Ontario

A plain-language walk through an Ontario building permit, from the first zoning check to final inspection, and how to keep it moving.

Read the guide →
PERMIT BASICS · 5 MIN READ

What affects the cost of permit drawings in the GTA

The factors that set the price of permit drawings in the GTA: scope, existing conditions, engineering, zoning issues and city comments, and how to compare quotes.

Read the guide →
PERMIT BASICS · 6 MIN READ

Built without a permit? What to do about an order to comply

What happens when work was done without a building permit in Ontario, what an order to comply means, and the practical steps to legalize the work.

Read the guide →
WhatsApp us