Call: 289-962-4003 Email: ar.manjinderkaur@gmail.com Studio: 15845 River Dr, Georgetown, ON WhatsApp: 289-962-4003
KS Designers logo KS Designers PERMITS · DRAWINGS · INTERIORS
KS GUIDE · PERMIT BASICS

Do you need a permit for an interior renovation?

Which interior renovations need a building permit in Ontario: removing walls, new bathrooms, stairs and basements, and which cosmetic work usually does not.

By the KS Designers teamUpdated November 20265 min read
Open-concept interior renovation with a wall removed
THE SHORT ANSWER

Cosmetic updates like paint, flooring, trim, cabinets and replacing fixtures in the same place usually do not need a permit. Removing or moving walls that carry load, adding plumbing, changing stairs, adding bedrooms or creating a new unit usually do.

Usually no permit

  • Painting, flooring and trim
  • Replacing cabinets and counters without moving plumbing
  • Replacing fixtures in the same location
  • Most like-for-like repairs

Usually a permit

  • Removing or altering a load-bearing wall
  • Adding a bathroom, kitchen or laundry with new drains
  • Building, moving or changing stairs
  • Finishing a basement with new rooms or plumbing
  • Creating a second unit
  • Changing a garage into living space

Load-bearing walls

A wall that supports floors or the roof needs a properly sized beam, posts and footings where the load comes down. That design goes on structural drawings for the permit. Opening a wall without that design is one of the most common causes of sagging floors and cracked finishes.

Electrical is separate

Electrical work in Ontario is overseen by the Electrical Safety Authority. Your licensed electrician files the notification and arranges ESA inspection, separately from the building permit.

Not sure? Ask before you start

Rules differ slightly by city, and the line between cosmetic and permit work is not always obvious. A quick look at your plan tells you which parts need a permit so you do not get stopped partway.

Questions people ask us

Do I need a permit to remove a wall?

If it is load-bearing, yes, with structural drawings. Even non-load-bearing walls can hide ducts or plumbing, so check first.

Does a basement finish need a permit?

Usually yes once you add rooms, plumbing or a bedroom.

Who inspects electrical?

The Electrical Safety Authority, through your licensed electrical contractor.

This guide is general information for Ontario and is not legal advice. Building Code requirements, zoning bylaws and city processes change and vary by municipality, so confirm the details for your property with your municipality or a qualified designer before you build.

SERVICES FOR THIS PROJECT

How KS can help

Interior alteration permitNew walls, openings and layout changes.View service → Load-bearing wall removalBeam sizing and structural drawings.View service → Structural drawingsBeams, foundations, framing, reports.View service → Plumbing & electricalLayouts, risers, lighting and power.View service →

Keep reading

All guides →
PERMIT BASICS · 7 MIN READ

How the building permit process works in Ontario

A plain-language walk through an Ontario building permit, from the first zoning check to final inspection, and how to keep it moving.

Read the guide →
PERMIT BASICS · 5 MIN READ

What affects the cost of permit drawings in the GTA

The factors that set the price of permit drawings in the GTA: scope, existing conditions, engineering, zoning issues and city comments, and how to compare quotes.

Read the guide →
PERMIT BASICS · 6 MIN READ

Built without a permit? What to do about an order to comply

What happens when work was done without a building permit in Ontario, what an order to comply means, and the practical steps to legalize the work.

Read the guide →
WhatsApp us