Call: 289-962-4003 Email: ar.manjinderkaur@gmail.com Studio: 15845 River Dr, Georgetown, ON WhatsApp: 289-962-4003
KS Designers logo KS Designers PERMITS · DRAWINGS · INTERIORS
SHEET M-430 · MECHANICAL

HVAC & SB-12 design

Heat loss and heat gain calculations, duct layouts, equipment sizing, HRV/ERV ventilation and SB-12 energy efficiency compliance for new homes, additions and basement units.

BCIN-qualified drawings
City submission handled
5.0 on Google
High-efficiency furnace and HRV with new ductwork
TYPICAL SCOPE Heat loss, ducts, HRV/ERV, SB-12 & commercial exhaust
Often.

Do you need HVAC drawings for your permit?

Often. New homes, additions, second units and many renovations need heat loss calculations and duct layouts, and new construction must show energy efficiency compliance under the Ontario Building Code's SB-12. Your designer needs the right qualification to sign HVAC design.

IS THIS YOU?

Where most of our hvac & sb-12 design clients start

SITUATION 01

New homes and additions

Heat loss calculations, duct design and energy compliance.

SITUATION 02

Basement second units

Heat and fresh air for two households.

SITUATION 03

Commercial spaces

Ventilation and exhaust for a new use.

DRAWING INDEX

The sheets in a typical permit set

Every property is different, so we confirm the exact list with your city. Most applications include:

M-001Heat loss / gain · room-by-room calculations
M-101Duct layout · supply and return runs
M-102Equipment · furnace, AC, heat pump sizing
M-201Ventilation · HRV / ERV and exhaust
M-301SB-12 summary · energy efficiency path
M-401Details · duct sizes and notes
Floor plans and building sections from a permit drawing set EXAMPLE SHEETS · ILLUSTRATIVE
SCOPE OF WORK

Included when you work with KS

  • Room-by-room heat loss and heat gain
  • Supply and return duct layout
  • Furnace, heat pump or air conditioner sizing
  • HRV or ERV ventilation design
  • Bathroom and kitchen exhaust
  • Energy efficiency compliance documents
  • Signed HVAC design for the permit
ONLY IF YOUR PROJECT NEEDS IT

We coordinate

  • Mechanical engineer for larger commercial systems
  • Kitchen exhaust specialists for restaurants
  • Your HVAC contractor during installation

We tell you up front if any of these apply, so there are no surprise add-ons later.

WHAT WE CHECK

Key requirements we design for

Heat loss

How much heat each room needs in winter.

Heat gain

Cooling needs in summer.

Ducts

Supply and return layout sized for each room.

Equipment

Furnace, heat pump or AC sized to the load.

Ventilation

HRV or ERV and bathroom and kitchen exhaust.

SB-12

Energy efficiency compliance for new work.

EXISTING CONDITIONS

Before we design: what we check in your system

We start with the house itself: insulation, windows and how air leaks in and out. That is what decides how much heat each room actually needs.

Then the existing system: equipment size and age, where the ducts run, and whether the trunk lines can feed new rooms. Oversized equipment is as much a problem as undersized; it short-cycles and leaves rooms uneven.

For second units we plan how air moves between the two homes, because shared ducts have specific rules. Sometimes a separate system is simpler; sometimes smoke dampers work. We show you the options.

AVOID DELAYS

Why these applications get sent back

These are comments plan examiners often raise. We address each one in the drawings before we submit.

We cover this
Heat loss calculation missing
We cover this
Duct layout does not match the floor plan
We cover this
Equipment oversized or undersized
We cover this
No ventilation design
We cover this
SB-12 compliance path not shown
THE KS PROCESS

From site visit to issued permit

KS designer measuring a basement with a laser measure and tablet1
A-001 · LISTENYOU + KS

Site visit

We review the floor plans and existing system.

Design consultation with floor plans, a 3D render and material samples2
A-100 · DESIGNKS

Design & zoning

We calculate loads and choose equipment with you.

Bound permit drawing set beside a laptop showing a city permit portal3
A-200 · DRAWKS

Drawings & submit

Mechanical sheets and SB-12 documents are completed.

Building permit card posted in the window of a house under renovation4
A-300 · APPROVEKS + CITY

Comments & permit

We answer plan-examiner comments until the permit is issued.

FROM OUR CLIENTS 5.0 From 7 Google reviews Read all reviews →
"Had a great experience working with them for our basement second dwelling unit project. The architectural work was done very professionally, with clear drawings, good communication, and attention to detail throughout the process."
Kulwinder K. · Basement second unit · Google review
QUESTIONS

Common questions

Does a basement unit need its own HVAC?

The unit needs proper heating and ventilation, and fire separation affects how ducts are shared. We design what fits your house.

What is SB-12?

Supplementary Standard SB-12 sets energy efficiency requirements for houses in the Ontario Building Code.

Can you design heat pumps?

Yes. We size heat pumps and other systems to the load.

Do you do commercial kitchen exhaust?

Yes, for restaurant and café fit-outs.

Do you design heat pumps?

Yes. We size heat pumps to the calculated load.

What should I send for a quote?

Your floor plans or drawings and what system you have now.

READ BEFORE YOU START

Guides for this project

All guides →
KS GUIDE · 9 MIN READLegal basement apartment requirements in OntarioWhat makes a basement apartment legal in Ontario: zoning, ceiling height, exits, escape windows, fire separation, alarms and HVAC, plus warning signs of an illegal unit.Read the guide →KS GUIDE · 5 MIN READCustom home and rebuild permitsThe approvals behind a new custom home or rebuild in Ontario: zoning, demolition, site grading, trees, energy compliance and the full drawing set.Read the guide →KS GUIDE · 7 MIN READPlanning a home addition: rear, side and second-storeyHow to plan a rear, side or second-storey addition in Ontario: zoning limits, structure, mature neighbourhood rules and the permit drawings needed.Read the guide →
WE WORK ACROSS THE GTA AND ONTARIO, INCLUDING
GeorgetownHalton HillsMiltonOakvilleBurlingtonMississaugaBramptonCaledonTorontoVaughanMarkhamRichmond HillHamiltonGuelphKitchener-WaterlooDurham Region

Need HVAC or SB-12 drawings?

Send us your plans. We'll prepare the calculations and layouts your city needs.

RELATED SERVICES

Often done together

Basement apartment permitLegal second units, new or existing.Learn more → Custom home permitNew homes, concept to permit.Learn more → Home addition permitRear, side and second-storey additions.Learn more → Restaurant & commercialFit-outs and change of use.Learn more →
WhatsApp us