Pickering makes registration of every additional dwelling unit mandatory under By-law 8040/23, after inspections by both Building and Fire. Applications are online only. Our permit drawings for a Pickering basement unit start at $1,500, plus City fees and any mechanical (HVAC) drawings the city requires.
Pickering rules for basement and additional units
- Registration of additional dwelling units is mandatory (By-law 8040/23).
- Registration needs final inspections by Pickering Fire and Building Services, and all fees paid.
- Building permit applications and PDF drawings go through the City's online portal; paper is not accepted.
- Pre-approved ADU designs are available for purchase from the City.
Heating: confirmed with the examiner
Pickering does not publish a separate furnace rule. We apply the Ontario Building Code age test and confirm with the examiner.
Our price for a basement unit in Pickering
Our permit drawings for a legal basement second unit in Pickering start at $1,500. City or town permit fees, and mechanical (HVAC) drawings when the city requires them, are extra. A new entrance or structural work is quoted by project, and other project types are priced after we see the scope. You get a fixed written quote after we see photos of the space.
What we prepare
- Site measurement and a zoning check for your lot
- Floor plans, sections and fire separation details
- Escape windows, exits and the separate entrance
- Heating, ventilation and plumbing layouts
- The application, submission and answers to the examiner's comments
Areas we cover
We prepare drawings across Amberlea, Liverpool, Rougemount, Bay Ridges, Duffin Heights, Seaton, Brock Ridge and the rest of Pickering.
Sources
Questions people ask us
Do you prepare building permit drawings in Pickering?
Yes. KS Designers prepares building permit drawings in Pickering for legal basements, side entrances, additions, decks and more, with 1,000+ permits completed and structural and mechanical P.Eng partners when needed.
Do I need to register my Pickering basement apartment?
Yes. Registration is mandatory and happens after Fire and Building inspections.
How much are basement permit drawings in Pickering?
Our drawings for a Pickering basement unit start at $1,500. City fees and mechanical (HVAC) drawings, if the city requires them, are extra.
This page is general information for Ontario and is not legal advice. Building Code requirements, zoning bylaws and city processes change and vary by municipality, so confirm the details for your property with your municipality or a qualified designer before you build.
