Triplex & fourplex permit drawings
Many Ontario cities now allow up to three or four units on a residential lot, through basement units, additions, garden suites or a new multiplex. We check what your lot allows and prepare the building permit drawings, with structural and mechanical P.Eng partners.
Where most of our triplex & fourplex permits clients start
The sheets in a typical permit set
Every property is different, so we confirm the exact list with your city. Most applications include:
EXAMPLE SHEETS · ILLUSTRATIVE
Included when you work with KS
- Zoning check for the number of units
- Layout and access for every unit
- Architectural drawings
- Structural and mechanical design with P.Eng partners
- Permit application
- Responses to city comments
We coordinate
- Structural and mechanical P.Eng
- Civil or servicing engineer if the city asks
- Minor variance if the plan needs relief
We tell you up front if any of these apply, so there are no surprise add-ons later.
Key requirements we design for
Zoning
How many units the lot allows.
Parking & access
Parking and a path to each entrance.
Fire separation
Rated separations between all units.
Exits
A safe way out of every unit.
Services
Water, sewer and electrical capacity.
Structure
Engineered where required.
What decides how many units fit
Zoning sets the number of units, and the city sets parking and setbacks. We check those first, because they decide everything else.
Access is next. Every unit needs a clear path to its entrance, and narrow side yards often limit where a basement or rear unit can go.
Then services and structure: water and sewer size, electrical capacity, and any additions or new floors, designed with our engineers.
What to know about triplex & fourplex permits projects
The questions we answer most often, explained the way we would at your kitchen table.
Talk to us about yoursMore units are allowed now
Ontario cities have opened up to three or four units on many lots, but each city writes its own rules.
Access decides a lot
Side yard width and parking often decide where units can go.
One team
Architectural drawings from us, structural and mechanical from our P.Eng partners, in one permit set.
Check before you buy
Thinking of buying a lot for a multiplex? We can check zoning first.
Why these applications get sent back
These are comments plan examiners often raise. We address each one in the drawings before we submit.
From site visit to issued permit
"Had a great experience working with them for our basement second dwelling unit project. The architectural work was done very professionally, with clear drawings, good communication, and attention to detail throughout the process."
Common questions
How many units can I have on my lot?
Many Ontario cities now allow a main house plus up to two or three more units, but it depends on your zoning. We check your address before any design work.
Is a fourplex Part 9 or Part 3 of the Building Code?
Most small houses converted to three or four units stay under Part 9, but size and layout can change that. We confirm it early because it affects the design.
Do you work with engineers?
Yes. Structural and mechanical design is done with licensed P.Eng partners.
Can I add a garden suite as one of the units?
Often, yes, depending on your city and lot.
Guides for this project
Thinking of adding units?
Send us your address. We'll tell you how many units your lot allows.