Additions need a building permit, applied for through the Town's online portal. Additions are quoted by project after we see your survey and photos, because size, storeys and zoning all change the work.
When Milton needs a permit
- Additions need a building permit, applied for through the Town's online portal.
- Milton lists its fee for a new house or an addition at $25.13 per square metre, with a $264.20 minimum.
- Parking and side yard rules often decide how big an addition can be, so we check zoning first.
How Milton takes the application
Milton takes residential building permit applications online through the Town's online services portal, where you upload drawings, pay and track the application. We prepare the drawings and the forms, submit them for you and answer the examiner's comments.
What we prepare
- A zoning check of setbacks, height and lot coverage before design
- Site plan, floor plans, elevations and sections
- Foundations, framing and the connection to the existing house
- Energy efficiency (SB-12) and heating and ventilation design
- The application, and answers to the examiner's comments
Our price
Additions are quoted by project after we see your survey and photos, because size, storeys and zoning all change the work. You get a fixed written quote listing everything included. City permit fees, and any engineering or HVAC design your city asks for, are separate.
Where we work in Milton
We prepare drawings across Old Milton, Timberlea, Dempsey, Beaty, Clarke, Harrison, Willmott, Ford, Cobban and the rest of Milton. See our Milton permit page for basement unit rules in Milton.
Sources
Questions people ask us
Do I need a permit for a home addition in Milton?
Yes. Additions need a building permit, applied for through the Town's online portal.
Will my addition need a minor variance?
Only if it does not meet zoning. We check setbacks, height and lot coverage before design and tell you early.
How much are addition permit drawings in Milton?
Additions are quoted by project after we see your survey and photos, because size, storeys and zoning all change the work. You get a fixed written quote listing everything included. City permit fees, and any engineering or HVAC design your city asks for, are separate.
This page is general information for Ontario and is not legal advice. Building Code requirements, zoning bylaws and city processes change and vary by municipality, so confirm the details for your property with your municipality or a qualified designer before you build.
