If an addition needs substantial removal of the existing house, a separate demolition permit is also required. Additions are quoted by project after we see your survey and photos, because size, storeys and zoning all change the work.
When Oakville needs a permit
- If an addition needs substantial removal of the existing house, a separate demolition permit is also required.
- An addition that brings the house to six or more bedrooms needs a Building Code Part 6 ventilation design.
- Heritage properties and land under conservation authority control need those approvals as well.
How Oakville takes the application
Oakville takes building permit applications online, and the Town is moving all permit steps into a single ePlan platform. We prepare the drawings and the forms, submit them for you and answer the examiner's comments.
What we prepare
- A zoning check of setbacks, height and lot coverage before design
- Site plan, floor plans, elevations and sections
- Foundations, framing and the connection to the existing house
- Energy efficiency (SB-12) and heating and ventilation design
- The application, and answers to the examiner's comments
Our price
Additions are quoted by project after we see your survey and photos, because size, storeys and zoning all change the work. You get a fixed written quote listing everything included. City permit fees, and any engineering or HVAC design your city asks for, are separate.
Where we work in Oakville
We prepare drawings across Glen Abbey, River Oaks, West Oak Trails, Bronte, Iroquois Ridge, Clearview, College Park, North Oakville and the rest of Oakville. See our Oakville permit page for basement unit rules in Oakville.
Sources
Questions people ask us
Do I need a permit for a home addition in Oakville?
Yes. If an addition needs substantial removal of the existing house, a separate demolition permit is also required.
Will my addition need a minor variance?
Only if it does not meet zoning. We check setbacks, height and lot coverage before design and tell you early.
How much are addition permit drawings in Oakville?
Additions are quoted by project after we see your survey and photos, because size, storeys and zoning all change the work. You get a fixed written quote listing everything included. City permit fees, and any engineering or HVAC design your city asks for, are separate.
This page is general information for Ontario and is not legal advice. Building Code requirements, zoning bylaws and city processes change and vary by municipality, so confirm the details for your property with your municipality or a qualified designer before you build.