Basement legalization: make your basement unit legal

Already have a basement apartment that was built without a permit? We measure what is there, show what has to change to meet the Ontario Building Code and zoning, and prepare the building permit drawings and application to legalize it.

6 years · 1,000+ permits · BCIN-qualified lead designer
Drawings as soon as the next day
All of the GTA & Ontario
Bright finished legal basement apartment with egress window, sofa and bedroom
TYPICAL SCOPE Existing units, rental basements, registration & city orders
Usually.

Can an existing basement apartment be legalized?

Usually, yes. You apply for a building permit with drawings of what exists and what will change. Common changes are fire separation, interconnected smoke and CO alarms, egress windows, ceiling heights and heating. Some cities also require the unit to be registered before it is rented.

IS THIS YOU?

Where most of our basement legalization clients start

SITUATION 01

You bought a house with a basement unit

It was there when you bought it, with no permit.

SITUATION 02

You want to rent it legally

Insurance, tenants and the city all expect a legal unit.

SITUATION 03

The city sent a notice

An inspector found the unit and set a deadline.

DRAWING INDEX

The sheets in a typical permit set

Every property is different, so we confirm the exact list with your city. Most applications include:

E-101Existing basement plan · measured as built
A-101Proposed basement plan · changes to meet the Code
A-102Main floor plan · fire separation above
A-301Sections · ceiling heights and egress windows
M-101HVAC layout · shared or separate heating
F-101Fire separation details · alarms, doors and ceilings
Floor plans and building sections from a permit drawing set EXAMPLE SHEETS · ILLUSTRATIVE
SCOPE OF WORK

Included when you work with KS

  • Site visit and measurement of the existing unit
  • Zoning and parking check
  • List of changes needed to meet the Code
  • Existing and proposed drawings
  • HVAC design where required
  • Permit application, comments and registration support
ONLY IF YOUR PROJECT NEEDS IT

We coordinate

  • Structural P.Eng for new openings or beams
  • Mechanical P.Eng where engineered design is needed
  • Your contractor for the corrections

We tell you up front if any of these apply, so there are no surprise add-ons later.

WHAT WE CHECK

Key requirements we design for

Zoning & parking

We confirm the unit is allowed on your lot and how much parking the city needs.

Fire separation

Rated ceilings, walls and doors between the two units.

Smoke & CO alarms

Interconnected alarms in both units.

Egress windows

Bedroom windows large enough to escape through.

Ceiling height

Clear height in rooms and under beams and ducts.

Heating

Shared or separate heating, by house age and city.

EXISTING CONDITIONS

What usually has to change

Most units we legalize need work in the same places: fire separation in the ceiling above, interconnected smoke and CO alarms, and bedroom windows big enough to escape through.

Ceiling height is the other big one. Ducts and beams often sit lower than the Code allows, so we measure every room and design around low spots.

Heating depends on the house and the city. Some allow a shared furnace with a smoke detector in the ducts, others need separate heating.

IN DETAIL

What to know about basement legalization projects

The questions we answer most often, explained the way we would at your kitchen table.

Talk to us about yours
01

Start with what is there

Legalizing begins with measured drawings of the basement as it is today, not as someone planned it.

02

Fix only what the Code needs

We list the changes the Code and zoning require, so you are not paying for work you do not need.

03

Rent with confidence

A legal, registered unit protects you with tenants, insurers and buyers.

04

Engineers when needed

New openings, beams or engineered heating are done with our structural and mechanical P.Eng partners.

AVOID DELAYS

Why these applications get sent back

These are comments plan examiners often raise. We address each one in the drawings before we submit.

We cover this
Bedroom windows too smallWe show which ones must be enlarged.
We cover this
No fire separation aboveWe detail the rated ceiling.
We cover this
Low ceilings under ductsWe design around them.
We cover this
Shared heating not allowedWe design separate heating.
We cover this
Unit not registeredWe help you through registration.
THE KS PROCESS

From site visit to issued permit

KS designer measuring a basement with a laser measure and tablet1
A-001 · LISTENYOU + KS

Site visit

We visit and measure the basement as it is now.

Design consultation with floor plans, a 3D render and material samples2
A-100 · DESIGNKS

Design & zoning

We check zoning and list what must change.

Bound permit drawing set beside a laptop showing a city permit portal3
A-200 · DRAWKS

Drawings & submit

We draw the existing and proposed plans and submit the permit.

Building permit card posted in the window of a house under renovation4
A-300 · APPROVEKS + CITY

Comments & permit

We answer comments until the permit is issued and the unit can be registered.

FROM OUR CLIENTS 5.0 Average Google rating Read all reviews →
"Had a great experience working with them for our basement second dwelling unit project. The architectural work was done very professionally, with clear drawings, good communication, and attention to detail throughout the process."
Kulwinder K. · Basement second unit · Google review
QUESTIONS

Common questions

Is it illegal to rent a basement without a permit?

Renting a unit that does not have a building permit, or is not registered where the city requires it, can lead to an order and fines. Legalizing it protects you and your tenants.

Will I have to open up walls?

Sometimes. Inspectors may need to see fire separation, insulation or wiring. We tell you what to expect before you apply.

How much does it cost to legalize a basement?

Our basement permit drawings start from $1,200 in Brampton, Mississauga and Milton and from $1,500 in other cities, plus city fees and mechanical (HVAC) drawings if required.

Do you work with engineers?

Yes. Structural and mechanical design is done with licensed P.Eng partners when the work needs it.

How long does legalizing take?

Drawings are usually quick once we have measured. City review time depends on your city.

READ BEFORE YOU START

Guides for this project

Scroll for more →Explore all →
WE WORK ACROSS THE GTA AND ONTARIO, INCLUDING
GeorgetownHalton HillsMiltonOakvilleBurlingtonMississaugaBramptonCaledonTorontoVaughanMarkhamRichmond HillHamiltonGuelphKitchener-WaterlooDurham Region

Want to make your basement legal?

Send us your address and photos of the basement. We'll tell you what has to change.

FREE QUOTE · STEP 1 OF 2About 30 seconds
Where are you now?
RELATED SERVICES

Often done together

Basement apartment permitLegal second units, new or existing.Learn more → Order to comply drawingsDrawings and a permit to answer a city order.Learn more → Walkout & side entranceNew openings, stairs, guards and drainage.Learn more → HVAC & SB-12 designHeat loss, ducts and energy compliance.Learn more →
WhatsApp us