Order to comply drawings & permits
Received an order to comply or a notice of violation from your city? We read the order with you, measure what was built, and prepare the drawings and permit application needed to respond before the deadline.
Where most of our order to comply drawings clients start
What a typical response includes
Every property is different, so we confirm the exact list with your city. Most applications include:
EXAMPLE SHEETS · ILLUSTRATIVE
Included when you work with KS
- Review of the order and the cited violations
- Site visit to measure what was built
- As-built and proposed drawings
- HVAC design where required
- Building permit application and submission
- Responses to plan examiner comments until the permit is issued
We coordinate
- Licensed structural engineer for beams, openings and foundations
- Zoning relief if the use or addition is not permitted
- Your contractor for the corrective work
We tell you up front if any of these apply, so there are no surprise add-ons later.
Key requirements we design for
The order and its deadline
Each order lists specific violations and a date. Those decide the scope and the order of work.
As-built drawings
The permit drawings must show what was actually built, measured on site.
Code corrections
Fire separation, smoke and CO alarms, exits, egress windows and ceiling heights are the most common items.
Structure
Removed walls, new openings and additions may need an engineer's review and details.
Heating and ventilation
Basement units can need HVAC design, and some cities require separate heating.
Zoning
The unit or addition must be allowed on your lot, or it needs relief.
What we look at first
We start with the order itself. The listed violations and the deadline decide what has to be drawn and in what order.
Then we measure what was actually built. Drawings that show a plan instead of the real conditions get questioned, and that costs time you may not have.
Finally we check zoning and structure, because a unit or addition that is not allowed, or a removed wall without an engineered beam, needs more than a standard permit set.
What to know about order to comply drawings projects
The questions we answer most often, explained the way we would at your kitchen table.
Talk to us about yoursRead the order first
An order to comply is specific. Before anything is drawn, we go through each violation it cites and the date it gives, so the drawings answer exactly what the city asked.
Illegal basement apartments
Most orders we see involve basement units. Legalizing one usually means fire separation, egress, ceiling heights, alarms and heating, all shown on permit drawings.
Drawings are one part of closing an order
A permit, inspections and corrective construction may also be needed. We explain the full path so you know what comes after the drawings.
Who prepares what
We prepare the architectural and HVAC drawings as a BCIN-qualified firm, coordinate structural work with licensed engineers, and tell you early if your project needs an architect.
Why these applications get sent back
These are comments plan examiners often raise. We address each one in the drawings before we submit.
From site visit to issued permit
"Had a great experience working with them for our basement second dwelling unit project. The architectural work was done very professionally, with clear drawings, good communication, and attention to detail throughout the process."
Common questions
What is an order to comply?
A written order from your municipality that lists Building Code or bylaw violations at your property and the date by which they must be fixed.
Can you help with an illegal basement apartment?
Yes. Legalizing an existing basement unit is one of the most common reasons clients contact us with an order.
Do I need an engineer or an architect?
Sometimes. We are a BCIN-qualified design firm. Where the order involves structural work we coordinate with a licensed engineer, and we tell you early if your project needs an architect.
Will drawings alone close the order?
Not always. Closing an order can also need a permit, inspections and corrective construction. We explain the full path when we review your order.
Can you ask the city for more time?
You or your representative can ask the municipality. Having drawings under way and a permit application in progress usually helps that conversation.
How fast can you start?
We aim to review your order quickly and book the site visit, because most orders have a deadline.
Do you work across Ontario?
Yes. Most of our order work is in Peel, Halton, Durham, Toronto and Waterloo Region.
What should I send?
A photo of the order, the address, photos of the work and any drawings you already have.
Guides for this project
Received an order to comply?
Send us a photo of the order. We'll tell you what it needs and what to do first.






